Aug. 25, 2026

General Contractor

  • Completed concrete flooring in sections AA and AB of the new building.
  • Completed construction of the first two stair towers and the elevator shaft.
  • Added protective overhead structures and other safety modifications along the student walkways between the Senior High School and Intermediate High School.
  • Installed a new stormwater drainage structure in the courtyard between the Senior High School and new Intermediate High School.
  • Began laying the foundation for retaining walls near the new parking area adjacent to the Senior High School entrance.

Electrical Contractor

  • Installed underground electrical infrastructure and floor outlets in sections AA and AB of the new building.
  • Continued installing electrical wiring within the walls of the second stair tower.
  • Continued installation of the fire alarm system in the basement of the Administration Building.

Plumbing Contractor

  • Installed underground plumbing and floor drains in sections AA and AB of the new building.
  • Installed sprinkler system piping in the crawl space beneath the existing Intermediate High School.

Mechanical Contractor

  • Continued installing new heating, cooling and mechanical piping in the crawl space beneath the existing Intermediate High School.